More rear suspension work.
Today I got one strut tower located and some framing welded up to hold it in place. The passenger side is now located where it is supposed to be but it is not fully braced so it can’t support the weight of the car yet.
Today I got one strut tower located and some framing welded up to hold it in place. The passenger side is now located where it is supposed to be but it is not fully braced so it can’t support the weight of the car yet.
The last two days have been getting the car squared up. Since the concrete was flat and the lift arms were square it made getting it lined up much easier. I started by squaring up the front end and getting some chalk lines on the…
Today I cut out the brackets out to make the lower mount for the suspension. It took a while to get everything shaped properly so I only got one side built. I will weld up the other side tomorrow. Once I get the lower sides…
First step in trying to get the chassis rolling is to build the suspension parts. The first part I need is the top of the strut tower. So I pulled the suspension off the vert body so I could get a template of the strut…
This video pretty much explains everything about how to replace the top on a Geo Metro or Suzuki Swift Convertible. Just remember that it needs to be warm and sitting out in the sun when changing tops and it will be easy to do.